Salalah International Airport.
*Passenger Transport Building (PTB) & Air Traffic Control Tower (ATC)*
Working as a Executive BIM Engineer with 14 team members in Architectural and Structural BIM Model + Class Coordination with MEPF services department in Construction stages. Planned
and analyzed the project and reviewed all the project dates deeply. BIM Methodology, Quality
checks, Resource planning & Micro-Level BIM implementation included in this project.
Project Area:
Project Cost: Project Scope: Project job responsibility: Project Team Member: Project Time line: |
65,638m² (7.5 million ft²).
OMR (USD 763ml) BIM Modeling + Class Coordination + Clash free BIM model with Construction drawings. Executive BIM Engineer. 14 +14 Months. |